Jacobs Tapped for DFW Airport’s Skylink System Design Modifications
Jacobs has been selected to lead design modifications for the Skylink system, a key component of the DFW Terminal F expansion project at Dallas-Fort Worth International Airport.

Dallas Fort Worth, TX, November 27, 2026 — Jacobs has been awarded a contract to lead design modifications for the Skylink system at Dallas-Fort Worth International Airport (DFW). The company’s selection centers on its role in the ongoing expansion of DFW’s Terminal F.
The Skylink system is identified as a crucial element within the larger Terminal F development initiative. Further details regarding the specific nature of the design modifications, timelines, or the scope of Jacobs’ involvement beyond leading the design modifications were not provided.
Airport expansion projects often involve intricate planning and execution to ensure enhanced passenger experience and operational efficiency. The Skylink system, as a key component, typically facilitates passenger movement between different areas of the airport, contributing significantly to the overall functionality of the terminals. The Terminal F expansion project aims to increase capacity and modernize facilities at DFW, one of the busiest airports in the world.
The selection of Jacobs for this specific design modification task indicates a focus on refining or upgrading the existing Skylink infrastructure to align with the new terminal’s requirements. This phase of development is critical for integrating new systems and ensuring seamless operations as the airport continues to grow. Information about the contractor’s specific proposals or the projected outcomes of these modifications was not detailed in the announcement.
Story summarized from the original created by Google News on news.google.com, see more information here.